Is the water volume in local water features impacted by solar projects?

We have designed this project to have little to no impact on local water volumes, per the requirements of MCCD, which dictate that post-development peak flow rates must be detained or reduced from the 2, 5, 25, 50, and 100-year storm events pre-development. These stringent requirements not only control high flow rates and erosive velocities of the outfall channels but also mitigate large post-development volumes of water flushing the river system.

All runoff volume impacted by Swiftwater Solar will be released into the system at a slower rate than what is the case currently with the use of basins, which promote higher infiltration rates and ensures groundwater recharge after large storm events.